24/7 Emergency: 07414 254125
REFCOM · F-Gas Certified
Pub cellar cooling unit mounted above beer kegs and line system

Cellar Cooling

Cellar Cooler Installation in London & the M25

A cellar cooler evaporator can ice up when airflow is restricted or the system runs too cold. New installations need sizing to the cellar’s heat gains and structure.

REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum

Fitting and replacing a cellar cooler unit

This page is about the equipment itself — fitting a new cellar cooler or replacing a failed one. Where an old unit is being swapped, the existing pipework, power supply and condensate route are checked for reuse, the old refrigerant is recovered and recorded, and the replacement is matched to the cellar rather than simply to the old unit’s size.

Ask whether the new unit uses a lower-GWP refrigerant than the one it replaces, what the controller set point and alarm arrangements will be, and how the condensing unit will be accessed for cleaning.

Commissioning a new cellar installation

Commissioning covers a pressure test and vacuum, charging by weight, checking the controller set point and defrost, and recording the refrigerant charge for F-Gas records.

New cellar systems

Size the cooler to cellar volume, walls, door use and equipment heat; place the condensing unit where it can reject heat freely and be serviced.

Siting a new condensing unit

Condensing units for cellars often go in yards, light wells or on flat roofs. They need free airflow, shade where possible, a route for pipework and condensate, and space for future servicing.

Other guides on cellar cooler icing and installation

Common questions on cellar cooler icing and installation are answered on the Cellar Refrigeration page.

Agreeing an installation

Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.

  • Equipment model and positions
  • Pipe, drain and electrical scope
  • Commissioning, warranty registration and first service

Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.

How each type of visit works and all rates · What to have ready when you book · How we work