



From a single wall split in a meeting room to a full VRF roll-out across a multi-floor office, we handle the survey, heat-load calculation, condenser positioning, pipework, electrical connection and commissioning — finished with a full F-Gas handover and warranty registration.
What we cover
Free on-site survey
Heat-load calculation, unit sizing and condenser positioning advice before any quote.
Wall, ceiling & cassette splits
Single and multi-split installations for offices, retail, hospitality and residential.
VRF / VRV systems
Heat pump and heat recovery VRF for multi-zone offices, hotels and mixed-use buildings.
Concealed ducted units
Ducted indoor units for clean ceilings in boardrooms, suites and high-end residential.
Pipework, brackets & drainage
Insulated copper runs, condensate pumps, vibration brackets and weather-protected condenser mounts.
F-Gas commissioning & handover
Pressure test, vacuum, gas charge, controls setup and warranty registration documented in full.
Brands we service
Mitsubishi Electric · Daikin · Toshiba · LG · Fujitsu · Panasonic · Samsung
Frequently asked questions
London Locations Covered
Regional coverage and specialist services
Agreeing an installation
Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.
- Equipment model and positions
- Pipe, drain and electrical scope
- Commissioning, warranty registration and first service
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work
Air Conditioning Installation: scope, checks and next steps
How to separate the possible causes and decide between repair and replacement is covered on the main commercial air conditioning page.
What each check helps establish
- Wall-mounted split & multi-split installations
- Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Ceiling cassette & ducted concealed systems
- Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- VRF / VRV multi-zone design and commissioning
- Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Pipework runs, drainage, condensate pumps & electrics
- Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.