
Commercial Air Conditioning
Air Conditioning Inspection in London & the M25
An inspection records condition and performance without assuming a fault. It is useful before buying or leasing a building, before summer, after poor comfort complaints or when planning replacement.
TM44 is a different inspection
Buildings with air conditioning over 12 kW effective rated output need an energy assessment at least every five years, carried out by an accredited air conditioning energy assessor. A performance test by a service engineer does not replace it.
After the inspection
Use the findings to set maintenance priorities and budgets. Repairs found during an inspection are normally quoted separately.
Other guides on ac inspection and performance testing
Common questions on ac inspection and performance testing are answered on the AC Performance Testing page.
Choosing the right visit
Describe the equipment and what you need — a repair, a service, an inspection or a quote for new equipment — so the visit is scoped correctly and the right engineer attends.
- The outcome you need from the visit
- Equipment details and access
- How findings will be reported
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted.
How each type of visit works and all rates · What to have ready when you book · How we work