A chiller cools water or glycol that is pumped to coils around a building or process. Faults may be on the refrigeration side, the water side or in the controls that link them, so readings are taken on both circuits.

REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum

Replacing an existing chiller

Replacement starts with what the building needs now rather than the old nameplate: measured loads, water temperatures, glycol content, noise limits and the power available. Older chillers on high-GWP refrigerants are often replaced with units using lower-GWP alternatives, which can change size, weight and electrical demand.

The change-over itself needs planning: refrigerant recovered from the old unit by F-Gas certified engineers, oil and equipment disposed of with waste transfer records, a lifting plan (and any road or crane permits) for removal and placement, and temporary cooling where the site cannot be without chilled water. The new unit is then connected, filled, commissioned and recorded.

Installation and replacement

Selection depends on cooling load, water temperatures, glycol content, noise limits, space, power and access. Replacement often needs a lifting plan, temporary cooling and recommissioning of the water system.

Flow faults and lockouts

Flow switches stop the chiller when water flow is too low. Blocked strainers, failed or air-locked pumps, closed valves and air in the system are common causes; the switch itself is checked last.

Planned maintenance

Visits typically cover refrigerant leak checks, compressor and electrical checks, coil or tube cleaning, water flow and temperature logging, controller alarm history review and water treatment checks.

Commercial chiller, chilled water and data centre cooling

Agreeing a replacement

Replacement quotes should name the new equipment or component, what is being reused and what is not, how refrigerant and old equipment are handled and how the result is commissioned.

  • Exact replacement model or part number
  • Recovery and disposal of the old equipment
  • Commissioning and handover records

Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.

How each type of visit works and all rates · What to have ready when you book · How we work