
Commercial Plumbing & Plant Rooms
Commercial Pump Replacement in London & the M25
Replacement pumps are specified from measured duty rather than the old nameplate, which is usually oversized and expensive to run.
Commercial Pump Replacement explained
Replacement pumps are specified from measured duty rather than the old nameplate, which is usually oversized and expensive to run.
- Duty and head from readings: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Twin head and standby: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Inverter and BMS integration: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Isolation and lifting plan: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
Commercial Pump Replacement: scope and decisions
Agreeing a replacement
Replacement quotes should name the new equipment or component, what is being reused and what is not, how refrigerant and old equipment are handled and how the result is commissioned.
- Exact replacement model or part number
- Recovery and disposal of the old equipment
- Commissioning and handover records
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and materials are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work