CRAC & Server Room Cooling
CRAC Unit Servicing in London & the M25
CRAC servicing on close control units, including humidifier, condensate and alarm testing plus a resilience and run-hour review for the room.
CRAC Unit Servicing explained
CRAC servicing on close control units, including humidifier, condensate and alarm testing plus a resilience and run-hour review for the room.
- Refrigeration pressures and superheat: Interpret readings against operating conditions and equipment specification; do not assume a recharge is the answer.
- Filter, coil and airflow checks: Filter condition can restrict airflow; cleaning and replacement requirements depend on the filter specification.
- Humidifier cylinder and water condition: Water condition, cleaning and equipment suitability should be checked against the manufacturer’s requirements.
- Condensate pump and drainage test: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
- Alarm, sensor and set point verification: Compare the input reading, requested output and actual equipment response; an error code is a starting point, not a diagnosis.
- Rotation, resilience and run-hours review: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
Interpreting the reported fault
Compare rack-inlet conditions, airflow paths, alarms and standby operation. A room-average temperature can conceal hot spots at individual racks.
- Reported symptom: a planned service due on close control units that must not fail
CRAC Unit Servicing: scope and decisions
Server-room cooling responds to equipment heat rather than just comfort. Loss of one unit can matter even when another system keeps the room apparently cool.
Assess repair together with the site’s resilience plan. A replacement should match the actual sensible cooling load, continuous operating conditions and standby arrangement.
Provide cooling-unit models, alarm times, affected racks and the IT team’s escalation procedure. Never send passwords or network credentials with the request.
Agreeing planned maintenance
A maintenance visit records condition and performance. Faults found are reported and quoted separately unless your contract says otherwise. Agree the asset list and visit frequency first.
- Which assets are included
- Tasks per visit and the report format
- How faults found are authorised
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. Contracts are quoted per asset list and visit interval.
How each type of visit works and all rates · What to have ready when you book · How we work