Legionella & Water Hygiene

Dead Leg Removal in London & the M25

Dead legs are cut back to the live main rather than simply capped, and the schematic is updated so the next assessor sees the change.

REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum

Dead Leg Removal explained

Dead legs are cut back to the live main rather than simply capped, and the schematic is updated so the next assessor sees the change.

  • Dead leg survey: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
  • Cut back to the main: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
  • Capped versus removed: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
  • Post-works schematic update: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.

Dead Leg Removal: scope and decisions

Choosing the right visit

Describe the equipment and what you need — a repair, a service, an inspection or a quote for new equipment — so the visit is scoped correctly and the right engineer attends.

  • The outcome you need from the visit
  • Equipment details and access
  • How findings will be reported

Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted.