
HIU & Communal Heating
HIU No Hot Water in London & the M25
No hot water from an HIU is diagnosed in stages — primary supply, strainer, control valve, exchanger — so the right part is replaced first time.
REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum
HIU No Hot Water explained
No hot water from an HIU is diagnosed in stages — primary supply, strainer, control valve, exchanger — so the right part is replaced first time.
- Primary supply confirmation: Electrical tests and isolation belong to a qualified person; repeated resetting should not replace fault investigation.
- DHW plate exchanger: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Control valve position: Compare the input reading, requested output and actual equipment response; an error code is a starting point, not a diagnosis.
- Flow switch or sensor: Compare the input reading, requested output and actual equipment response; an error code is a starting point, not a diagnosis.
HIU No Hot Water: scope and decisions
Choosing the right visit
Describe the equipment and what you need — a repair, a service, an inspection or a quote for new equipment — so the visit is scoped correctly and the right engineer attends.
- The outcome you need from the visit
- Equipment details and access
- How findings will be reported
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted.
How each type of visit works and all rates · What to have ready when you book · How we work