
Mains Water Supplies
New Water Supply Installation in London & the M25
We handle the route, ducting, meter housing and commissioning, including chlorination and sampling before the supply is used.
REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum
New Water Supply Installation explained
We handle the route, ducting, meter housing and commissioning, including chlorination and sampling before the supply is used.
- Application and connection liaison: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Route and duct design: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Meter housing: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Commissioning and chlorination: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
New Water Supply Installation: scope and decisions
Agreeing an installation
Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.
- Equipment model and positions
- Pipe, drain and electrical scope
- Commissioning, warranty registration and first service
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work