
Saniflo & Macerators
Saniflo Installation in London & the M25
New Saniflo installs are planned around the discharge route first, so the lift and run stay inside the manufacturer limits and the unit does not struggle.
Saniflo Installation explained
New Saniflo installs are planned around the discharge route first, so the lift and run stay inside the manufacturer limits and the unit does not struggle.
- Discharge route and head: Interpret readings against operating conditions and equipment specification; do not assume a recharge is the answer.
- Vertical lift limits: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Vent and non-return valve: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
- Isolated fused spur: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
Saniflo Installation: scope and decisions
Agreeing an installation
Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.
- Equipment model and positions
- Pipe, drain and electrical scope
- Commissioning, warranty registration and first service
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work