24/7 Emergency: 07414 254125
REFCOM · F-Gas Certified
HVAC engineer’s refrigeration gauges, vacuum pump and hand tools on a workbench

Saniflo & Macerators

Saniflo Installation in London & the M25

New Saniflo installs are planned around the discharge route first, so the lift and run stay inside the manufacturer limits and the unit does not struggle.

REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum

Saniflo Installation explained

New Saniflo installs are planned around the discharge route first, so the lift and run stay inside the manufacturer limits and the unit does not struggle.

  • Discharge route and head: Interpret readings against operating conditions and equipment specification; do not assume a recharge is the answer.
  • Vertical lift limits: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
  • Vent and non-return valve: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
  • Isolated fused spur: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.

Saniflo Installation: scope and decisions

Agreeing an installation

Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.

  • Equipment model and positions
  • Pipe, drain and electrical scope
  • Commissioning, warranty registration and first service

Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.

How each type of visit works and all rates · What to have ready when you book · How we work