
Stopcocks & Pressure Control
Stopcock Replacement in London & the M25
Old gate-style stopcocks are replaced with full bore lever valves, often under pressure or via freezing so the supply stays on.
REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum
Stopcock Replacement explained
Old gate-style stopcocks are replaced with full bore lever valves, often under pressure or via freezing so the supply stays on.
- Full bore lever valve upgrade: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
- Freeze or under-pressure change: Interpret readings against operating conditions and equipment specification; do not assume a recharge is the answer.
- Access improvement: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Post-fit isolation test: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
Stopcock Replacement: scope and decisions
Agreeing a replacement
Replacement quotes should name the new equipment or component, what is being reused and what is not, how refrigerant and old equipment are handled and how the result is commissioned.
- Exact replacement model or part number
- Recovery and disposal of the old equipment
- Commissioning and handover records
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work