
VRF / VRV
VRV Installation in London & the M25
VRF and VRV systems connect many indoor units to shared outdoor units, so one fault can affect a whole floor and addresses and communication are checked first.
After installation
Agree the first service date and keep the commissioning records; manufacturers may require evidence of regular servicing for extended warranties.
Outdoor unit position
The outdoor unit needs free airflow, a secure base, safe access for service and consideration of noise and planning restrictions. Landlord consent is often required in commercial leases.
Other guides on ac installation planning
- Cassette AC Installation
- Commercial AC Installation
- Ducted AC Installation
- Rooftop AC Installation
- Split AC Installation
- VRF Installation
Common questions on ac installation planning are answered on the VRF Installation page.
Agreeing an installation
Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.
- Equipment model and positions
- Pipe, drain and electrical scope
- Commissioning, warranty registration and first service
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work