24/7 Emergency: 07414 254125
REFCOM · F-Gas Certified
Rooftop VRF air conditioning condensers on a London commercial building

VRF / VRV

VRV Installation in London & the M25

VRF and VRV systems connect many indoor units to shared outdoor units, so one fault can affect a whole floor and addresses and communication are checked first.

REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum

After installation

Agree the first service date and keep the commissioning records; manufacturers may require evidence of regular servicing for extended warranties.

Outdoor unit position

The outdoor unit needs free airflow, a secure base, safe access for service and consideration of noise and planning restrictions. Landlord consent is often required in commercial leases.

Other guides on ac installation planning

Common questions on ac installation planning are answered on the VRF Installation page.

Agreeing an installation

Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.

  • Equipment model and positions
  • Pipe, drain and electrical scope
  • Commissioning, warranty registration and first service

Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.

How each type of visit works and all rates · What to have ready when you book · How we work