24/7 Emergency: 07414 254125
REFCOM · F-Gas Certified
HVAC engineer’s refrigeration gauges, vacuum pump and hand tools on a workbench

AHU Services

AHU Filter Replacement in London & the M25

AHU filter replacement to the correct grades with seals checked, gauges reset and a planned change programme set up for the site.

REFCOM & F-Gas certified24/7 emergency callout£120+VAT/hr · 1 hr minimum

AHU Filter Replacement explained

AHU filter replacement to the correct grades with seals checked, gauges reset and a planned change programme set up for the site.

  • Filter grade and size survey: Filter condition can restrict airflow; cleaning and replacement requirements depend on the filter specification.
  • Panel, bag and HEPA replacement: Damage or moisture can change heat gain; assess the enclosure as well as the mechanical plant.
  • Seal and frame condition: Closure and seal contact should be checked together; a new gasket will not correct a misaligned door.
  • Pressure gauge reset and logging: Interpret readings against operating conditions and equipment specification; do not assume a recharge is the answer.
  • Disposal of used filters: Filter condition can restrict airflow; cleaning and replacement requirements depend on the filter specification.
  • Scheduled change programme: Agree the interval against manufacturer guidance, operating hours and equipment condition rather than assuming one schedule suits every asset.

Interpreting the reported fault

Inspect filters, belts or direct drives, dampers, coils and control response. Airflow limitations may be mechanical or arise from the control strategy.

  • Reported symptom: high filter pressure alarms, dust carry-over or an overdue filter change

AHU Filter Replacement: scope and decisions

Air handling and ventilation concern delivered airflow as well as fan operation. A motor running does not establish adequate supply or extract at the occupied space.

Fan upgrades need the required duty and compatibility checked. Replacing a motor alone will not correct excessive system resistance, failed dampers or an unsuitable operating schedule.

Provide the unit model, symptoms, filter records and safe access arrangements. Explain whether the issue is noise, reduced flow, temperature or loss of extract.

Agreeing a replacement

Replacement quotes should name the new equipment or component, what is being reused and what is not, how refrigerant and old equipment are handled and how the result is commissioned.

  • Exact replacement model or part number
  • Recovery and disposal of the old equipment
  • Commissioning and handover records

Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.