Commercial Air Conditioning
Commercial AC Commissioning in London & the M25
Commissioning proves a new or altered system is installed correctly and performing as designed. It is the stage that produces the records later maintenance and warranty depend on.
When re-commissioning is needed
After compressor replacement, major pipework changes, relocations or adding indoor units, the system should be recommissioned rather than simply restarted.
What commissioning covers
Pressure test and evacuation records, refrigerant charge calculated and weighed in, electrical checks, running pressures and temperatures, airflow, condensate drainage, controls addressing and set-up.
Other guides on ac commissioning
Common questions on ac commissioning are answered on the VRF Commissioning page.
Agreeing an installation
Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.
- Equipment model and positions
- Pipe, drain and electrical scope
- Commissioning, warranty registration and first service
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work