
VRV & VRF Systems
VRF Commissioning in London & the M25
VRF and VRV systems connect many indoor units to shared outdoor units, so one fault can affect a whole floor and addresses and communication are checked first.
Handover information
Expect the commissioning record, refrigerant details for the F-Gas record, controller instructions and any manufacturer warranty registration requirements.
Questions to settle before work
Who provides access, who configures any BMS link, and whether commissioning is witnessed by the client or consultant.
Other guides on ac commissioning
AC commissioning: questions
Agreeing an installation
Installation quotes are only comparable when they list the same scope: equipment, pipe lengths, drains, electrical work, access, making good and commissioning. A written quote follows a site survey.
- Equipment model and positions
- Pipe, drain and electrical scope
- Commissioning, warranty registration and first service
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work