
Fan Coil Unit Services
Fan Coil Unit Maintenance in London & the M25
Planned fan coil unit maintenance that keeps filters, coils, drains, valves and controls in condition and cuts reactive callouts across a building.
Fan Coil Unit Maintenance explained
Planned fan coil unit maintenance that keeps filters, coils, drains, valves and controls in condition and cuts reactive callouts across a building.
- Quarterly, bi-annual or annual visit plans: Agree the interval against manufacturer guidance, operating hours and equipment condition rather than assuming one schedule suits every asset.
- Filter stock and change intervals: Filter condition can restrict airflow; cleaning and replacement requirements depend on the filter specification.
- Coil and drain hygiene regime: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
- Belt-free EC fan motor checks: Operation, mechanical condition and control demand must be separated before condemning the drive.
- Valve and strainer maintenance: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
- Trend review of recurring faults: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Priority response for contract sites: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
Interpreting the reported fault
Check fan response, filter condition, valve operation, coil condition and condensate drainage. A working fan does not establish that the water coil is receiving the required flow.
- Reported symptom: rising energy use, recurring faults and no planned maintenance in place
Fan Coil Unit Maintenance: scope and decisions
A fan coil transfers heat between room air and a water coil. The fan, control valve and building water supply all affect room output.
A fan, valve actuator or controller can often be assessed independently. Whole-unit replacement also requires access, coil duty, noise and connection compatibility to be considered.
Provide the unit location, access-panel position, controller behaviour and whether neighbouring units show the same problem.
Agreeing planned maintenance
A maintenance visit records condition and performance. Faults found are reported and quoted separately unless your contract says otherwise. Agree the asset list and visit frequency first.
- Which assets are included
- Tasks per visit and the report format
- How faults found are authorised
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. Contracts are quoted per asset list and visit interval.
How each type of visit works and all rates · What to have ready when you book · How we work