
Fan Coil Unit Services
Fan Coil Unit Servicing in London & the M25
Full fan coil unit servicing covering filters, coils, condensate, fan motors, valves and controls, with air-on/air-off readings recorded for every unit.
Fan Coil Unit Servicing explained
Full fan coil unit servicing covering filters, coils, condensate, fan motors, valves and controls, with air-on/air-off readings recorded for every unit.
- Filter change and grille clean: Filter condition can restrict airflow; cleaning and replacement requirements depend on the filter specification.
- Coil fin comb and hygiene clean: Condition and airflow affect heat transfer; look beyond surface appearance to obstruction and operating performance.
- Condensate tray, trap and pump check: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
- Fan motor, bearing and impeller inspection: Operation, mechanical condition and control demand must be separated before condemning the drive.
- Valve, actuator and PICV operation test: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
- Air-on and air-off temperature readings: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Written service sheet per asset: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
Interpreting the reported fault
Check fan response, filter condition, valve operation, coil condition and condensate drainage. A working fan does not establish that the water coil is receiving the required flow.
- Reported symptom: weak airflow, dusty grilles and units that no longer hold set temperature
Fan Coil Unit Servicing: scope and decisions
A fan coil transfers heat between room air and a water coil. The fan, control valve and building water supply all affect room output.
A fan, valve actuator or controller can often be assessed independently. Whole-unit replacement also requires access, coil duty, noise and connection compatibility to be considered.
Provide the unit location, access-panel position, controller behaviour and whether neighbouring units show the same problem.
Agreeing planned maintenance
A maintenance visit records condition and performance. Faults found are reported and quoted separately unless your contract says otherwise. Agree the asset list and visit frequency first.
- Which assets are included
- Tasks per visit and the report format
- How faults found are authorised
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. Contracts are quoted per asset list and visit interval.
How each type of visit works and all rates · What to have ready when you book · How we work