
Fan Coil Unit Services
Fan Coil Unit Control Valve Replacement in London & the M25
Replacement of fan coil control valves that have seized, passed or failed open, with the flow rate rechecked and the circuit vented after fitting.
Fan Coil Unit Control Valve Replacement explained
Replacement of fan coil control valves that have seized, passed or failed open, with the flow rate rechecked and the circuit vented after fitting.
- Valve body and cartridge replacement: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
- Belimo, Frese and Danfoss valves supplied: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
- Isolation and local drain down: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
- Union and adaptor renewal: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Actuator refit and stroke test: Check movement, control command and the effect on flow together; the actuator and valve body can fail independently.
- Flow rate verified after fitting: Distinguish a pump fault from air, restrictions or closed valves elsewhere in the circuit.
- System refill, vent and pressure check: Interpret readings against operating conditions and equipment specification; do not assume a recharge is the answer.
Interpreting the reported fault
Check fan response, filter condition, valve operation, coil condition and condensate drainage. A working fan does not establish that the water coil is receiving the required flow.
- Reported symptom: a unit stuck hot, stuck cold or ignoring the thermostat
Fan Coil Unit Control Valve Replacement: scope and decisions
A fan coil transfers heat between room air and a water coil. The fan, control valve and building water supply all affect room output.
A fan, valve actuator or controller can often be assessed independently. Whole-unit replacement also requires access, coil duty, noise and connection compatibility to be considered.
Provide the unit location, access-panel position, controller behaviour and whether neighbouring units show the same problem.
Agreeing a replacement
Replacement quotes should name the new equipment or component, what is being reused and what is not, how refrigerant and old equipment are handled and how the result is commissioned.
- Exact replacement model or part number
- Recovery and disposal of the old equipment
- Commissioning and handover records
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and materials are quoted in writing before they are fitted. New equipment is a fixed written quote after a survey.
How each type of visit works and all rates · What to have ready when you book · How we work