
Fan Coil Unit Services
Fan Coil Unit Deep Cleaning in London & the M25
Deep cleaning of heavily fouled fan coil units, including chemical coil cleaning, fan impeller degreasing and tray sanitisation with a hygiene report.
Fan Coil Unit Deep Cleaning explained
Deep cleaning of heavily fouled fan coil units, including chemical coil cleaning, fan impeller degreasing and tray sanitisation with a hygiene report.
- Unit strip-down for access: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Chemical coil deep clean: Condition and airflow affect heat transfer; look beyond surface appearance to obstruction and operating performance.
- Drain tray and trap sanitisation: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
- Fan impeller degrease and balance: Operation, mechanical condition and control demand must be separated before condemning the drive.
- Plenum and ductwork interface clean: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Anti-microbial treatment and rinse: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Hygiene report with photographs: Water condition, cleaning and equipment suitability should be checked against the manufacturer’s requirements.
Interpreting the reported fault
Check fan response, filter condition, valve operation, coil condition and condensate drainage. A working fan does not establish that the water coil is receiving the required flow.
- Reported symptom: heavily fouled coils, biofilm in trays and persistent odour complaints
Fan Coil Unit Deep Cleaning: scope and decisions
A fan coil transfers heat between room air and a water coil. The fan, control valve and building water supply all affect room output.
A fan, valve actuator or controller can often be assessed independently. Whole-unit replacement also requires access, coil duty, noise and connection compatibility to be considered.
Provide the unit location, access-panel position, controller behaviour and whether neighbouring units show the same problem.
Agreeing planned maintenance
A maintenance visit records condition and performance. Faults found are reported and quoted separately unless your contract says otherwise. Agree the asset list and visit frequency first.
- Which assets are included
- Tasks per visit and the report format
- How faults found are authorised
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. Contracts are quoted per asset list and visit interval.
How each type of visit works and all rates · What to have ready when you book · How we work