Fan Coil Unit Services
Fan Coil Unit Drain Cleaning in London & the M25
Cleaning and clearing of fan coil condensate drains, trays, traps and pipework, then a water test to prove the drain runs away properly.
Fan Coil Unit Drain Cleaning explained
Cleaning and clearing of fan coil condensate drains, trays, traps and pipework, then a water test to prove the drain runs away properly.
- Drain tray clean and sanitise: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
- Trap clear and refill: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Condensate pipework rod and flush: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
- Fall and gradient check: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Pump chamber and float clean: Distinguish a pump fault from air, restrictions or closed valves elsewhere in the circuit.
- Anti-microbial treatment: Confirm the component identity and model-specific requirements before deciding whether adjustment, testing or replacement is appropriate.
- Drain test with water poured to tray: Confirm where condensate should discharge and whether the obstruction, pump or drainage arrangement is responsible.
Interpreting the reported fault
Check fan response, filter condition, valve operation, coil condition and condensate drainage. A working fan does not establish that the water coil is receiving the required flow.
- Reported symptom: water in the drip tray, slow drainage or staining on ceiling tiles
Fan Coil Unit Drain Cleaning: scope and decisions
A fan coil transfers heat between room air and a water coil. The fan, control valve and building water supply all affect room output.
A fan, valve actuator or controller can often be assessed independently. Whole-unit replacement also requires access, coil duty, noise and connection compatibility to be considered.
Provide the unit location, access-panel position, controller behaviour and whether neighbouring units show the same problem.
Agreeing planned maintenance
A maintenance visit records condition and performance. Faults found are reported and quoted separately unless your contract says otherwise. Agree the asset list and visit frequency first.
- Which assets are included
- Tasks per visit and the report format
- How faults found are authorised
Engineer labour is £120 + VAT per hour with a one-hour minimum; parts and refrigerant are quoted in writing before they are fitted. Contracts are quoted per asset list and visit interval.
How each type of visit works and all rates · What to have ready when you book · How we work